Apex Labs laboratory and office fit-out, King's Cross, London
Projects / Life Sciences & Laboratories

Apex Labs.

Replacement and installation of complete mechanical services for a state-of-the-art laboratory and office fit-out delivered over a 28-week programme in King's Cross, London.

Sector

Life Sciences & Laboratories

Location

King's Cross, London

Services

Design, Installation, Commissioning

Client

Reef Labs / Leading Pharmaceutical Company

Project Overview

Full mechanical services installation for a cutting-edge laboratory and commercial workspace.

MD Enertech Ltd was appointed to deliver the complete mechanical services installation for new laboratory and office accommodation at Reef Labs in King's Cross, London. Working within a high-specification life sciences environment, the project required the design, co-ordination and installation of modern building services to support laboratory, office and collaborative spaces while achieving the highest standards of performance, efficiency and occupant comfort.

The project comprised a full mechanical fit-out, including air conditioning, ventilation, domestic water services, above-ground drainage, automatic controls, and comprehensive testing and commissioning. Working collaboratively with the client, design team and principal contractor throughout the 28-week programme, our engineers delivered a high-quality installation providing reliable environmental control, superior indoor air quality and an energy-efficient workplace for one of the world's leading pharmaceutical companies.

Project at a Glance

Scope

Full mechanical fit-out

Environment

Laboratory & Commercial Office

Programme

28 weeks

System Spec

4-pipe fan coil & VAV ventilation

Delivered On

Time & High-Spec Quality

The Detail

Challenge, Solution & Outcome.

01. Challenge

Specialist demands in a high-spec environment

Delivering mechanical services for a dual-purpose life sciences facility required balancing standard office comfort with strict laboratory ventilation demands, precise environmental controls, and specialist drainage requirements within a tightly managed 28-week schedule.

02. Solution

Integrated design & high-efficiency installation

Our team installed high-efficiency 4-pipe fan coil systems alongside Variable Air Volume (VAV) ventilation controls and integrated BMS management. Works encompassed domestic hot and cold water services, laboratory drainage, and above-ground public health systems co-ordinated seamlessly with the wider design team.

03. Outcome

On programme, reliable & energy-efficient

The project was completed within the 28-week programme, fully tested, balanced, and commissioned. The completed installation delivers robust environmental control, exceptional indoor air quality, and optimised energy performance tailored to a global pharmaceutical leader.

Apex Labs laboratory fit-out, plant and ductwork installation
Apex Labs mechanical installation detail
Apex Labs laboratory services installation detail
Apex Labs completed laboratory and office workspace

Get in Touch

Let's build
something
together.

Drop us a line with your enquiry and our dedicated team will respond as soon as possible.

Head Office

M D Enertech Ltd
Excelsior House, Buntsford Park Road
Bromsgrove, B60 3DX

General Enquiries

sales@enertech.co.uk

Telephone

01527 900 900