Replacement and installation of complete mechanical services for a state-of-the-art laboratory and office fit-out delivered over a 28-week programme in King's Cross, London.
Sector
Life Sciences & Laboratories
Location
King's Cross, London
Services
Design, Installation, Commissioning
Client
Reef Labs / Leading Pharmaceutical Company
Project Overview
MD Enertech Ltd was appointed to deliver the complete mechanical services installation for new laboratory and office accommodation at Reef Labs in King's Cross, London. Working within a high-specification life sciences environment, the project required the design, co-ordination and installation of modern building services to support laboratory, office and collaborative spaces while achieving the highest standards of performance, efficiency and occupant comfort.
The project comprised a full mechanical fit-out, including air conditioning, ventilation, domestic water services, above-ground drainage, automatic controls, and comprehensive testing and commissioning. Working collaboratively with the client, design team and principal contractor throughout the 28-week programme, our engineers delivered a high-quality installation providing reliable environmental control, superior indoor air quality and an energy-efficient workplace for one of the world's leading pharmaceutical companies.
Project at a Glance
Scope
Full mechanical fit-out
Environment
Laboratory & Commercial Office
Programme
28 weeks
System Spec
4-pipe fan coil & VAV ventilation
Delivered On
Time & High-Spec Quality
The Detail
01. Challenge
Delivering mechanical services for a dual-purpose life sciences facility required balancing standard office comfort with strict laboratory ventilation demands, precise environmental controls, and specialist drainage requirements within a tightly managed 28-week schedule.
02. Solution
Our team installed high-efficiency 4-pipe fan coil systems alongside Variable Air Volume (VAV) ventilation controls and integrated BMS management. Works encompassed domestic hot and cold water services, laboratory drainage, and above-ground public health systems co-ordinated seamlessly with the wider design team.
03. Outcome
The project was completed within the 28-week programme, fully tested, balanced, and commissioned. The completed installation delivers robust environmental control, exceptional indoor air quality, and optimised energy performance tailored to a global pharmaceutical leader.
Get in Touch
Drop us a line with your enquiry and our dedicated team will respond as soon as possible.
Head Office
M D Enertech Ltd
Excelsior House, Buntsford Park Road
Bromsgrove, B60 3DX
General Enquiries
sales@enertech.co.ukTelephone
01527 900 900